What actually happens during a re-roof

A typical Teesside re-roof runs three to five working days: scaffold up, old covering stripped, structure inspected, new breathable underlay and battens, covering laid, ridges and verges finished, site tidied. The house stays weathertight every night, and you stay in it throughout.

Get Quote Call 01642 030497

Last updated: August 2026.

Before day one

Scaffolding goes up a few days before work starts, and the skip arrives. Inside, anything stored in the loft wants covering or moving, the strip is dusty and daylight will briefly be visible from up there. Cars move off the drive where the skip and deliveries need the space. That is the full extent of the disruption you can control in advance.

Day one: the strip

The old covering comes off, tiles or slates into the skip, sound slates palleted carefully if they are being reused. By day's end the roof is down to its structure: rafters and old battens exposed. This is the only day the house is vulnerable in principle, and it is managed by stripping in sections and felt-covering anything left open overnight. In practice, weathertight every night is the professional standard and anything less is a red flag.

Days two and three: the rebuild

With the structure exposed, anything dubious gets attention: a sagging section packed and braced, a rotten rafter foot spliced. Then the roof goes back together in layers, breathable membrane lapped and fixed, treated battens gauged for the covering, and the new slate or tile going on from the eaves up. Valleys, abutments and leadwork are formed as they are reached. This is the noisy phase, and the phase where progress is visible hour by hour.

Final days: ridges, verges and the tidy

Ridges and verges finish the covering, bedded traditionally or clipped into dry systems. Ventilation details go in, the gutters get checked, the scaffold comes down, and the site is swept, magnets across the drive for stray nails included. You get the paperwork: workmanship guarantee, manufacturer warranties, and building regs certification where applicable.

Weather and honesty

Teesside weather interrupts roofing, that is reality. A good contractor watches the forecast, never strips more than can be re-covered before rain, and tells you straight when a day is lost. What you should never hear is that the house was left open overnight because the schedule slipped.

Frequently asked questions

How long does a re-roof take?

Three to five working days for a typical semi in reasonable weather, longer for larger or more complex roofs. Scaffolding is up a few days either side.

Do I need to move out?

No. It is noisy and the loft gets dusty, but the house stays secure and weathertight throughout, every night included.

What happens if it rains mid-job?

Work pauses, opened sections are covered, and the schedule absorbs it. Roofs are never stripped further ahead than they can be re-covered before forecast rain.

How disruptive is it really?

Noise from early morning, the drive occupied by skip and deliveries, and dust in the loft. Most people stay home throughout; light sleepers and home workers notice it most.

What paperwork should I receive at the end?

Written workmanship guarantee, manufacturer warranties on coverings and membranes, and building regulations certification where the work triggered it.

Get a competitive quote for your Teesside roof replacement